South non - metallic ore processing

Processed Material: Magnetite Ore

Mine Method: Surface

Product Size: 0-10,10-50mm

Work Time: 10h

Ore Density: 2.6t/m³

PCapacity: 4500t/d

Grade: 53.8%

The evaluation by customer: Because of our high requirements for final particule granularity, I have followed the views of LIMING engineer with a two-stage crushing - a PE Jaw Crusher for primary crushing and two Hydraulic Cone Crusher HST160 for secondary crushing. Quite stable performance, also the production makes me satisfied. To my most pleasant surprise, the intelligent operation of machine has saved me a lot of time and also costs.

The evaluation by customer: Because of our high requirements for final particule granularity, I have followed the views of LIMING engineer with a two-stage crushing - a PE Jaw Crusher for primary crushing and two Hydraulic Cone Crusher HST160 for secondary crushing. Quite stable performance, also the production makes me satisfied. To my most pleasant surprise, the intelligent operation of machine has saved me a lot of time and also costs.

Copyright © 2004-2017 by China Liming Heavy Industry Science and Technology Co. LTD All rights reserved
Sitemap